About the Project

Upcoming Events

Saturday 8 March 2025 11:00 am to 02:00 pm

Open House

Come and visit us in person at the Wildwood Community Association at 4411 Spruce Drive SW.

Share your feedback!

Open March 7 - 31, 2025.

What we are proposing

Please view the example images below (Click on each image to enlarge/ zoom)

These images show how the street could look as well as design concepts moving along Spruce Drive from west (Edworthy) to southeast (Bow Trail).

The grey line is a multi-use bike path - this includes bike paths going in both directions, separated by a painted line, lined with lights and trees, with a separated sidewalk.

The crossings of the side streets will be raised so people walking and biking won’t lose height and ride over a bump – the biggest expected benefit of this is to slow vehicle turning speeds when entering the side-streets, as it will be a raised crossing and act like a speed bump for the vehicle.

These are example images from other places to give you an idea of what these improvements could look like (raised pathway, some trees/ lighting and a separated sidewalk).