Why is this corridor being considered?

Sections of the 7/8 Avenue corridor are scheduled for pavement rehabilitation in 2022. The City has heard concerns from residents regarding speeding and shortcutting along this corridor. It is currently an east-west connection as part of the wheeling network, and it also connects two north-south routes: the future 16 Street NW bikeway through Hillhurst to the 17 Street NW bikeway through Hounsfield Heights, as well as the 21 Street NW bikeway in Hillhurst through to the 22 Street NW bikeway in Hounsfield Heights.

What are our goals for this corridor design?

  1. Reduce vehicle speeds and traffic volumes.
  2. Improve pedestrian safety
  3. Enhance cycling and wheeling