ABOUT
Stage 1 of Green Line construction includes a 4 kilometre tunnel under the Bow River and through Centre City and the Beltline from 16 Avenue N to 4 Street S.E. The City is working with architects to further develop the station design for underground stations.
In January and February of 2018 we collected input on elements that will connect your community to the station area.
Underground stations include:
PROVIDE YOUR INPUT
Select a tab below to see how input was provided for that area.
BOULEVARD
Natural grasses
Permeable pavers and street trees
Manicured grass landscaping and street trees
PATHWAYS
Gravel, low impact development
Patterned sidewalk pavers with street trees and landscaping
Paved multi-use pathway
Upgraded sidewalks with street trees
STREET FURNISHINGS
City standard metal bench
Standard city bike lock up
Standard city garbage and recycle bins
PORTALS
Concrete with landscaping
Concrete with artist collaboration
Concrete with steel fencing
RAILINGS
Glass, open feeling
Artist collaboration
Metal picket railing
Punched metal railing
RETAINING WALLS
Rock, soil, landscaping
Patterned concrete
Standard concrete form-liner
Concrete with climbing plants
SOUND WALLS
Patterned concrete
SCREENING WALLS
Metal panel
Timber panel
Patterned concrete
INTERSECTION CROSSWALK TREATMENTS
Please consider the below image of intersection crosswalk options when answering the questions in this section.
Concrete station intersection