Segment 1 (Macleod Trail S to Fairmount Drive S.E.)
Segment 1 is approximately 860m and stretches from Macleod Trail S to Fairmount Drive S.E. A multi-use path has been added on the north side of the road in the boulevard space with some parking removed and the road narrowed slightly to reduce vehicle speeds to make room for the multi-use path. In some sections, the sidewalk is removed to provide enough space for the multi-use path.
Please note that these illustrated drawings are intended for visual and conceptual purposes only and are subject to change based on technical requirements.
The selection of images above illustrates the design changes throughout Segment 1. More detailed information on the changes can be found using the map below.
| What stays the same | What's changing |
|
|
Swipe the image to see before and after differences
90 Ave S.E. at Lord Beaverbrook High School.